Every year we carry out a programme of planned maintenance to ensure that homes are well maintained and comfortable to live in. We give the major components of each home a predicted life which we use to estimate when these components will next need replaced. This helps us develop future programmes of work.
Our current lifecycles are shown below:
File Description | File | Size |
---|---|---|
Asset Management Strategy | 2MB | |
Planned and Cyclical Maintenance Policy | 503KB |
Component | Predicted life |
Kitchen | 20 years |
Bathroom | 30 years |
Boilers & Controls | 15 years or beyond repair |
Radiators | 30 years |
Windows | 35-45 years depending on type |
Communal decoration | 7 years |
When finalising our budgets each year we will need to make decisions on which works to progress and which can be deferred. This ensures that we use available funds on the highest priority work. We will always prioritise:
- Tenant safety work such as gas & electrical safety inspections, smoke detection, fire safety work and any other inspections required by law
- Structural work
- Work to keep properties wind and watertight
- Work to help properties meet the Scottish Housing Quality Standard
We have shown below the work that is planned for the current financial year.
1st April 2022 – 31st March 2023
- 64 – 141 Fraser Court, Aberdeen
- 6 – 10 Palmerston Road, Aberdeen
- 1 – 54 Kiswebs Place, Elgin
- Allowance for 15 one off replacements to replace kitchens in poor condition or missed from previous programmes
1st April 2022 – 31st March 2023
- 36-44 Don Street, Aberdeen
- 42-44 Marischal Street, Aberdeen
- 1-25 Charlotte Gardens, Aberdeen
- Allowance for 15 one off replacements to replace kitchens in poor condition or missed from previous programmes
1st April 2022 – 31st March 2023
- 1-60 Charlotte Gardens, Aberdeen
- 90A-G John Street, Aberdeen
- 45-90 Stevenson Court, Aberdeen
- Anderson Court, Fraserburgh
- Allowance for 100 boiler replacements of boilers deemed uneconomical to repair
Gas heating upgrades are a mix of radiator only upgrades and boiler + radiator upgrades depending on what is required in each home
1st April 2022 – 31st March 2023
Windows
- 22-37 Uphill Lane, Peterhead
- 3 Kirk Street, Peterhead
Window upgrades will include upgrade of fascias, soffits, gutters and downpipes and may also include the upgrade of any external entrance doors where required
Doors
- 2A-I Seaforth Road – new fire rated flat entrance doors
1st April 2022 – 31st March 2023
- 22-37 Uphill Lane, Peterhead
- 3 Kirk Street, Peterhead
- 36-44 Don Street, Aberdeen
Door entry system upgrade involves removal of existing system (usually key operated) and replacement with fob operated system with new handsets in each flat
1st April 2022 – 31st March 2023
Aberdeen
- 381A-D George Street, Aberdeen
- 403A-E George Street, Aberdeen
- 405A-B George Street, Aberdeen
- 10-12 Rosemount Place, Aberdeen
- 383A-F George Street, Aberdeen
- 2A-I Seaforth Road, Aberdeen
- 1-31 Mugiemoss Court, Aberdeen
- -24 Richmond Street, Aberdeen
- 559-565 King Street, Aberdeen
- 464-466 Great Northern Road, Aberdeen
- 480-492 Great Northern Road, Aberdeen
- 1-30 Papermill Gardens, Aberdeen
- 66-74 Papermill Avenue, Aberdeen
Aberdeenshire
- Redcloak Drive, Stonehaven
- Pinewood House & Elphinstone Rd, Inverurie
- Arnha, Ellon
- 68-96 George Street, Huntly
- 1-17 Morrison Court, Turriff
- Eigie Crescent & Pettens Close, Balmedie
Moray
- 1-54 Kiswebs Place, Elgin
- 1-35 (odds) St Peters Terrace, Buckei
- Balnageith Rise, Forres
- Ben Aigen View, Rothes
- Covesea Road, Elgin
- Cromarty Court, Findhorn
- Culbert Street, Portsoy
- Faroes Court, Lossiemuth
- Hebenton Road, Elgin
- Kyd Drive, Elgin
- 1-13 Kiswebs Lane, Keith
- Mannachie Gardens & Mannachie Grove, Forres
- 15C-J The Meadows, Buckie
- Nelson Brae, Keith
- Strathisla Court, Keith
1st April 2022 – 31st March 2023
Render repairs
- Queen Street, Peterhead
- Grant Court, Peterhead
- George Street, Huntly
- King Street, Inverbervie
- Polinar Place, Inverurie
- Culbert Street, Portsoy
- Great Northern Road, Aberdeen
External lighting
- Seaton Place East, Aberdeen
- Royal Court, Forres
- Cross Street, Forres (rear area)
- The Meadows, Buckie (rear garden area)
1st April 2022 – 31st March 2023
- 10A-B Rosemount Place, Aberdeen – communal flooring
- 35 Forbes Street, Aberdeen – communal flooring & ceiling repairs
- Queen Street, Peterhead – internal communal lighting
1st April 2022 – 31st March 2023
Every year we carry out a programme of property compliance testing & inspecting to ensure homes are safe and meet legislative requirements. This work includes:
- Annual gas safety inspections
- 5 yearly electrical safety inspections
- Annual PAT testing of Kiswebs supplied electrical appliances
- Asbestos management inspections
- Servicing of adaptations equipment
- Fire equipment servicing (emergency lighting, smoke vents, dry risers etc)
- Fire risk assessments of communal areas in blocks of flats and supported accommodation
- Legionella management testing and risk assessments
- Lift servicing
- Testing of lightening protection
- Playpark inspections
- Testing of fall arrest systems
- Communal and domestic smoke / heat / CO detection
1st April 2022 – 31st March 2023
Every year we set a budget for dealing with unforeseen works that is identified during the year.